The SUNFLO-S series submersible pumps are specifically designed for reliable small-scale water supply from boreholes and wells. These pumps are ideal for remote pumping requirements in applications such as livestock watering, irrigation, and general water supply. Here are some applications where the SUNFLO-S series submersible pumps can be used:
1. Livestock Watering: The SUNFLO-S pumps are suitable for providing water to livestock in remote areas. They can efficiently lift water from boreholes or wells, ensuring a reliable and consistent water supply for livestock watering.
2. Irrigation Systems: These pumps can be utilized in small-scale irrigation systems, such as gardens, small agricultural plots, or horticultural applications. They can deliver water from underground sources to sprinkler systems, drip irrigation systems, or other water distribution methods.
3. Remote Water Supply: The SUNFLO-S pumps are ideal for remote locations where access to grid power is limited or unavailable. They can be used to pump water from boreholes or wells to storage tanks or directly to points of use, providing a reliable water supply.
4. Off-Grid Residential Water Supply: These pumps can be employed in off-grid residential settings where a reliable water supply is needed. They can deliver water from a borehole or well to storage tanks, allowing residents to access water for domestic use, including drinking, cooking, and sanitation.
5. Water Transfer in Rural Communities: The SUNFLO-S pumps can be used in rural communities to transfer water from a central borehole or well to communal storage tanks. This ensures access to clean water for various community needs, such as drinking, washing, and sanitation.
6. Environmental Conservation Projects: These pumps are suitable for environmental conservation initiatives that require water supply, such as habitat restoration or wildlife watering stations. They can provide a sustainable water source in remote locations, supporting ecosystem health.
7. Emergency Water Supply: The SUNFLO-S pumps can serve as an emergency water supply during power outages or natural disasters. They can pump water from boreholes or wells to meet immediate water needs in emergency situations.
8. Remote Monitoring Stations: These pumps can be used in remote monitoring stations or research facilities that require a reliable water supply. They can provide water for scientific experiments, data collection, or environmental monitoring applications.
The SUNFLO-S series submersible pumps, with their positive displacement three-chamber diaphragm design, durable materials, and automatic restart feature, offer a reliable and efficient solution for small-scale water supply. Whether it's for livestock watering, irrigation, or general water supply, these pumps are designed to meet the demands of remote pumping requirements in various applications.
OPERATING CONDITIONS
Pumped Liquid: Thin, clean, chemically non-aggressive liquids without solid particles.
Nominal Voltage: 18V-40V
Max. Liquid Temperature: +77°C
Ambient Temperature: -40°C-+60°C
Max. Immersion Depth: 30m
Internal by-pass Pressure: 7.5bar
Max. Voltage: 45V
Pump Data
Model |
Motor Power(W) |
Voltage (VDC) |
Input Power (Watts) |
Current (A) |
PV Modules (W) |
Outlet (") |
SUNFLO-S 300 |
300 |
24 |
200 |
4 |
1x200W |
½ |
330 |
6 |
1x330W |
400 |
6 |
2x200W parallel |